Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
ChinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMOQ:
1Medium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
A351 CF8MDesign Standard:
API 594Features
1. Safe and convenient, long service life, good sealing performance and high reliability;
2. The flow passage is smooth, the fluid resistance is small, the valve disc stroke is short, and the closing impact is small;
3. The overall structure is simple, compact and beautiful.
Technical Drawing
Product Description
Product Type |
Wafer Check Valve |
Product Size |
DN100 |
Product Pressure |
PN64 |
Connection Type |
Wafer Type |
Pressure-temperature |
ANSI B16.34 |
Flange Ends Dimension |
EN 1092-1 |
Face to Face Dimension |
API 594 |
Test & Inspection Code |
API 598 |
Dimension Checking
Pressure Testing
Nameplate & Packing
FAQ
1. Can the orders always be delivered on time?
Our purchasing team follows up very closely with each order to make sure on-time delivery for most of orders.
2. What’s the normal delivery lead time?
For normal material, usually the delivery time is about 35~40 days, and for forged material, the delivery can even be shortened to 20~25 days. We believe the short lead time can make our offer more competitive and help you secure more orders.