Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
ChinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMOQ:
1Medium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
A217 WC6+316Design Standard:
API 594Features
1. The double-plate wafer check valve disc has a short closing stroke, which can significantly reduce the water hammer phenomenon;
2. Short length, small volume, light weight, convenient installation, good sealing performance, long service life and high reliability.
Technical Drawing
Product Description
Product Type |
Wafer Check Valve |
Product Size |
8" |
Product Pressure |
600LB |
Connection Type |
Wafer Type RF |
Pressure-temperature |
ANSI B16.34 |
Flange Ends Dimension |
ANSI B16.5 |
Face to face dimension |
API594 |
Test & Inspection Code |
API 598 |
MAX. TEMP. |
595°C |
Dimension Checking
Pressure Testing
Painting
Nameplate & Packing
FAQ
1. Can the orders always be delivered on time?
Our purchasing team follows up very closely with each order to make sure on-time delivery for most of orders.
2. What’s the normal delivery lead time?
For normal material, usually the delivery time is about 35~40 days, and for forged material, the delivery can even be shortened to 20~25 days. We believe the short lead time can make our offer more competitive and help you secure more orders.
3. Do you have different price levels for us?
With our numerous suppliers, different price levels are available with us, so we are able to help you win more customer from different markets requesting for high, medium and low prices.