Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
ChinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMOQ:
1Medium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
A995 5ADesign Standard:
API 594Features
1. Large load change;
2. Small opening and closing frequency.;
3. Once in the closed or open state, the service life is very long, and it is not necessary to move moving parts.
Technical Drawing
Product Description
Product Type |
Wafer Check Valve |
Product Size |
3" |
Product Pressure |
150LB |
Connection Type |
Wafer Type |
Pressure-temperature |
ANSI B16.34 |
Flange Ends Dimension |
ANSI B16.5 |
Face to Face Dimension |
API 594 |
Test & Inspection Code |
API 598 |
MAX. TEMP. |
300°C |
Dimension Checking
Pressure Testing
Nameplate & Packing
FAQ
1. Can the orders always be delivered on time?
Our purchasing team follows up very closely with each order to make sure on-time delivery for most of orders.
2. What’s the normal delivery lead time?
For normal material, usually the delivery time is about 35~40 days, and for forged material, the delivery can even be shortened to 20~25 days. We believe the short lead time can make our offer more competitive and help you secure more orders.
3. Do you have different price levels for us?
With our numerous suppliers, different price levels are available with us, so we are able to help you win more customer from different markets requesting for high, medium and low prices.