Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
chinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMedium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
WCBDesign Standard:
API594
Product Type |
Dual Plate Lug Type Wafer Check Valve |
Product Size |
8" |
Product Pressure |
150LB |
Connection Type |
Lug Type |
Pressure-temperature |
ANSI B16.34 |
Flange Ends Dimension |
ANSI B16.5 |
Face to Face Dimension |
API 594 |
Test & Inspection Code |
API 598 |
1. The wafer design makes the valve compact and
lightweight compared to traditional check valves, ideal for installations with
space constraints;
2. Widely
used in industries such as oil, chemical processing, power generation, water
supply, and environmental protection, particularly in systems requiring
reliable backflow prevention.
1. Can the orders always be delivered on
time?
Our purchasing team
follows up very closely with each order to make sure on-time delivery for most
of orders.
2. What’s the normal delivery lead time?
For normal material,
usually the delivery time is about 35~40 days, and for forged material, the
delivery can even be shortened to 20~25 days. We believe the short lead time
can make our offer more competitive and help you secure more orders.
3. Do you have different price levels for
us?
With our numerous suppliers, different price levels are available with us, so we are able to help you win more customer from different markets requesting for high, medium and low prices.