Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
ChinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMOQ:
1Medium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
A351 CF8MDesign Standard:
API 5941. Simple and compact structure, small footprint. Suitable for occasions with limited installation space;
2. The switch operation is flexible and convenient, and can be manually operated, as well as coordinated with the actuator for automatic control.
Product Type |
Wafer Check Valve |
Product Size |
14" |
Product Pressure |
150LB |
Connection Type |
Wafer RF |
Pressure-temperature |
ANSI B16.34 |
Flange Ends Dimension |
ANSI B16.5 |
Face to Face Dimension |
API 594 |
Test & Inspection Code |
API 598 |
MAX. TEMP. |
200°C |
1. Can the orders always be delivered on time?
Our purchasing team follows up very closely with each order to make sure on-time delivery for most of orders.
2. What’s the normal delivery lead time?
For normal material, usually the delivery time is about 35~40 days, and for forged material, the delivery can even be shortened to 20~25 days. We believe the short lead time can make our offer more competitive and help you secure more orders.
3. Do you have different price levels for us?
With our numerous suppliers, different price levels are available with us, so we are able to help you win more customer from different markets requesting for high, medium and low prices.