Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
ChinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMOQ:
1Medium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
A995 5ADesign Standard:
API 594Features
1. The body structure is short in length and good in rigidity;
2. Wafer check valve is tightly sealed, has no leakage in the hydraulic test, is safe and reliable in operation, and has strong anti-interference ability.
Technical Drawing
Product Description
Product Type |
Wafer Check Valve |
Product Size |
4" |
Product Pressure |
150LB |
Connection Type |
Wafer Type |
Pressure-temperature |
ANSI B16.34 |
Flange Ends Dimension |
ANSI B16.5 |
Face to Face Dimension |
API 594 |
Test & Inspection Code |
API 598 |
MAX. TEMP. |
300°C |
Dimension Checking
Pressure Testing
Nameplate & Packing
FAQ
1. Can the orders always be delivered on time?
Our purchasing team follows up very closely with each order to make sure on-time delivery for most of orders.
2. What’s the normal delivery lead time?
For normal material, usually the delivery time is about 35~40 days, and for forged material, the delivery can even be shortened to 20~25 days. We believe the short lead time can make our offer more competitive and help you secure more orders.