Lead Time:
30~60 days Ex Works after order confirmationProduct Orgin:
ChinaShipping Port:
Shanghai, ChinaPayment:
30% when order confirmed, 70% before shipmentColor:
CustomizationMOQ:
1Medium:
Water Oil and GasWarranty period:
18 months after shipment or 12 months after useBody Material:
A216 WCB+STL6Design Standard:
API 6D1. Light weight, good rigidity and easy maintenance;
2. Compact structure, beautiful shape and small size;
3. Quick closing, no impact, small mass and low inertia.
Product Type |
Axial Flow Check Valve |
Product Size |
3" |
Product Pressure |
300LB |
Connection Type |
RF |
Basic Design |
API 6D |
End Flange Dimensions |
ANSI B16.5 |
Face to Face Dimensions |
API 6D |
Test & Inspection Code |
API 598 |
TEMP. |
-29°C ~ 300°C |
1. Can the orders always be delivered on time?
Our purchasing team follows up very closely with each order to make sure on-time delivery for most of orders.
2. What’s the normal delivery lead time?
For normal material, usually the delivery time is about 35~40 days, and for forged material, the delivery can even be shortened to 20~25 days. We believe the short lead time can make our offer more competitive and help you secure more orders.
3. Do you have different price levels for us?
With our numerous suppliers, different price levels are available with us, so we are able to help you win more customer from different markets requesting for high, medium and low prices.